DESIGN
ACOUSTIQUE
PROGRAMMATION

Skalli theatre, Sète

Photos

Théâtre, Chatel-Guyon
Théâtre, Chatel-Guyon
Théâtre, Chatel-Guyon
Théâtre, Chatel-Guyon

Technical Specifications

Scope :
Temporary renovation of Skalli theatre, in order to host the performances of Molière Theatre during its restoration

Budget :
600 k€

Opening Date :
2012

Architect:
Fabre Speller Architectes

Acoustician :
STUDIO D A P

Theatre planner:
SCENE, Paris

Seat count :
416 seats

Client :
Thau community

Press

Actualité de la scénographie

Creation of a temporary theatre and music venue, on an old wine cellar, the Chai Skalli, during the renovation works of the Molière theatre in the city of Sète located at a distance of a few hundred meters.

From an acoustic point of view, the original room had a reverberation time of five seconds because of its proportions and the installation of huge cisterns on its sides, which acted as ‘resonators’.

The nave of the wine storehouse was divided in three parts:

The first contains a front desk and a bar, the second one the stage and the audience, and the third one the backstage and the theatre boxes.

A number of reflectors were installed above the stage and the audience, in order to increase the sound reflection density between the stage and the audience area. As for the reduction of the reverberation time, the underside of the roof was partially covered with a high absorbing material. To avoid any possibility of sound coupling, the openings were also covered, giving onto the wooden cisterns.

This project was the subject of a press article at ‘Actualité de la Scénographie' (juin 2012)